This course covers the full Manufacturing module in Quickenerp. Learn how to create and manage bills of materials, manufacturing orders, routing plans, work center operations, subcontracting, planning, and production reporting.

Responsible System
Last Update 07/21/2026
Completion Time 3 days 22 hours
Members 1
Inventory & Manufacturing
Manufacturing Analysis & Cost Reports
Manufacturing Analysis & Cost Reports

Manufacturing Reporting

Manufacturing Analysis

Go to Manufacturing > Reporting > Manufacturing Analysis. Pivot table with:

  • Dimensions: Product, BOM, Work Center, Operation, Vendor (for subcontracting), Date.
  • Measures: Quantity Produced, Planned Quantity, Duration (hours), Cost, Scrap Quantity.
  • Filters: Order Status, Date Range, Product Category.

Cost Analysis

Open a completed MO → Cost Analysis button. See:

  • Raw Material Cost - Sum of all consumed components - cost price.
  • Operation Cost - Time spent at each work center - hourly cost.
  • Total Cost - Material + Operations.
  • Unit Cost - Total Cost / Quantity Produced.

Work Center Performance

Go to Reporting > Work Center Performance. See for each work center:

  • Planned hours vs actual hours.
  • OEE percentage.
  • Load rate (scheduled hours / available hours).
  • Number of MOs processed.

Best Practices

  • Review work center load weekly to avoid bottlenecks.
  • Track scrap percentage per product to identify quality issues.
  • Compare actual vs planned costs to improve BOM accuracy.
  • Use OEE to identify underperforming work centers.
Manufacturing Overview
View all
New Content
Manufacturing Analysis & Cost Reports
Manufacturing Analysis & Cost Reports
Preview

Manufacturing Reporting

Manufacturing Analysis

Go to Manufacturing > Reporting > Manufacturing Analysis. Pivot table with:

  • Dimensions: Product, BOM, Work Center, Operation, Vendor (for subcontracting), Date.
  • Measures: Quantity Produced, Planned Quantity, Duration (hours), Cost, Scrap Quantity.
  • Filters: Order Status, Date Range, Product Category.

Cost Analysis

Open a completed MO → Cost Analysis button. See:

  • Raw Material Cost - Sum of all consumed components - cost price.
  • Operation Cost - Time spent at each work center - hourly cost.
  • Total Cost - Material + Operations.
  • Unit Cost - Total Cost / Quantity Produced.

Work Center Performance

Go to Reporting > Work Center Performance. See for each work center:

  • Planned hours vs actual hours.
  • OEE percentage.
  • Load rate (scheduled hours / available hours).
  • Number of MOs processed.

Best Practices

  • Review work center load weekly to avoid bottlenecks.
  • Track scrap percentage per product to identify quality issues.
  • Compare actual vs planned costs to improve BOM accuracy.
  • Use OEE to identify underperforming work centers.
New Content
Subcontracting Workflows
Subcontracting Workflows
Preview

Subcontracting

Enable in Manufacturing > Configuration > Settings > Subcontracting. Allows outsourcing production to vendors.

Setup

  1. Go to Inventory > Configuration > Routes.
  2. Enable route "Subcontracting" if not already active.
  3. Go to your vendor's contact form, Sales & Purchases tab.
  4. Check Subcontractor. Set the Subcontracting Location (where raw materials are sent).
  5. On the product form, add the "Subcontracting" route.

Subcontracting Flow

  1. When stock reaches reorder point for a subcontracted product, a PO is created.
  2. Quickenerp creates a Subcontracting Receipt - raw materials are sent to the vendor.
  3. The vendor receives raw materials, produces the product, sends it back.
  4. You receive the finished product as a normal receipt.
  5. The PO is billed by the vendor.

Resupply Subcontractor

When confirming a subcontracted PO, Quickenerp auto-creates a delivery order to send raw materials to the subcontractor. The quantity of raw materials = BOM component quantity * PO quantity.

Tracking Subcontracted Stock

Raw materials sent to subcontractors are tracked in the Subcontracting Location (a virtual location). When the finished product is received, the raw material stock is consumed from there.

New Content
Production Planning & MRP
Production Planning & MRP
Preview

Production Planning

Replenishment-Based MO Creation

Products with route "Manufacture" and a reordering rule trigger MO creation:

  1. Go to Inventory > Master Data > Reordering Rules.
  2. Set route = Manufacture.
  3. When stock drops below minimum, the replenishment engine creates an MO.

Planned Orders

Go to Manufacturing > Planning > Planned Orders. These are tentative MOs not yet confirmed. Review and confirm them in batch. Useful for medium-term capacity planning.

MRP (Material Requirements Planning)

For advanced planning:

  1. Go to Manufacturing > Planning > MRP.
  2. Click Run MRP.
  3. Quickenerp analyzes:
  • Current stock levels.
  • Open sales orders.
  • Forecasted demand.
  • Reordering rules.
  • BOM structure (explodes multi-level BOMs).
  • Generates proposed MOs and purchase orders.
  • Review and confirm the proposals.
  • Production Scheduling

    The Gantt view in Manufacturing Orders shows scheduled MOs across work centers. Drag and drop to reschedule. Filter by work center, date, product.

    New Content
    Unbuild Orders & Reversals
    Unbuild Orders & Reversals
    Preview

    Unbuild Orders

    Go to Manufacturing > Operations > Unbuild Orders. Use when you need to disassemble a finished product back into components.

    Creating an Unbuild Order

    1. Click Create.
    2. Product - The finished good to disassemble.
    3. Quantity - Number of units to unbuild.
    4. BOM - Select which BOM to reverse.
    5. Lot/Serial Number - If tracked, select the specific lot.
    6. Location - Where to put the disassembled components.
    7. Click Unbuild.

    Use Cases

    • Quality failure - disassemble a defective unit and salvage components.
    • Correction of wrong MO.
    • Return to stock - customer return being broken down.

    MO Reversal (Cancel Done MO)

    If an MO was completed by mistake, you cannot delete it. Instead:

    • Create an unbuild order for the product.
    • Or create a scrap order for the finished goods.
    • Or create a new MO to consume the finished goods back to stock.
    New Content
    Creating, Confirming & Completing MOs
    Creating, Confirming & Completing MOs
    Preview

    Manufacturing Orders

    Go to Manufacturing > Operations > Manufacturing Orders.

    Creating an MO

    1. Click Create.
    2. Product - Finished good to produce.
    3. Quantity - Number of units.
    4. BOM - Auto-selected if only one BOM exists for the product.
    5. Routing - Auto-selected from BOM.
    6. Deadline Start - When production should begin.
    7. Deadline End - When production should be complete.
    8. Source Document - Auto-filled if created from sales order or reorder.
    9. Click Save.

    MO Lifecycle

    Status Meaning
    DraftMO created but not yet confirmed.
    ConfirmedMO is ready. Raw materials are reserved.
    In ProgressProduction has started (first operation logged).
    DoneAll operations complete. Finished goods in stock.
    CancelledMO is cancelled. Reserved material is freed.

    Confirming & Starting Production

    1. Click Confirm Production - Reserves raw materials.
    2. Click Plan - Assigns work orders to work centers.
    3. Click Start Production - Begins the first operation.
    4. Operators record time per operation.
    5. Click Record Components to register component consumption (if consuming manually).
    6. When all operations done, click Produce - The MO is completed.
    7. Finished goods appear in the WH/Stock location.

    Work Orders

    Each routing operation creates a work order. Open MO → Work Orders tab. Each work order shows:

    • Assigned work center and operator.
    • Scheduled start and end.
    • Components consumed at this operation.
    • Actual duration vs planned.

    Mark each work order as done by clicking the Complete Last Operation button on the MO.

    New Content
    Work Centers, Capacity & Routing Plans
    Work Centers, Capacity & Routing Plans
    Preview

    Work Centers

    Go to Manufacturing > Master Data > Work Centers. A work center is a machine, workstation, or production line.

    Work Center Fields

    Field Description
    NameWork center name (e.g. "CNC Machine", "Assembly Table 1").
    CodeShort code for reference.
    Working HoursCalendar of available hours. Excludes breaks, holidays.
    CapacityNumber of units this work center can process simultaneously.
    Time EfficiencyPercentage (90% = slower than standard). Affects lead time calculation.
    Time Before SetupPreparation time before production starts.
    Time After SetupClean-up time after production ends.
    Costs per HourStandard hourly cost for labor, overhead, and machine depreciation.
    OEE TargetOverall Equipment Effectiveness target.

    Routings

    Go to Manufacturing > Master Data > Routings. A routing defines the sequence of operations.

    1. Click Create.
    2. Reference - Routing name.
    3. Add Operations:
    • Sequence (1, 2, 3...) - Execution order.
    • Work Center - Where this operation is performed.
    • Duration - Time per unit.
    • Duration Type - Fixed (regardless of quantity) or Per Unit.
    • Start/Next Operation - For parallel or divergent flows.
    • Default - If "Quantity" is set, it defaults as next operation.

    Work Center Load View

    Go to Reporting > Work Center Performance. See the scheduled vs actual load. Identify bottlenecks. Color-coded: green (under 80% load), yellow (80-100%), red (overloaded).

    New Content
    Creating & Managing BOMs
    Creating & Managing BOMs
    Preview

    Bills of Materials

    Go to Manufacturing > Master Data > Bills of Materials.

    BOM Form - All Fields

    Field Model Field Behaviour
    Productproduct_idThe finished product this BOM produces.
    Quantityproduct_qtyNumber of units produced by one BOM cycle.
    BOM TypetypeNormal (manufacture this product), Kit (phantom BOM, product is a set).
    Routingrouting_idThe production steps required.
    ReferencecodeInternal BOM code (e.g. BOM-001).
    ActiveactiveUncheck to archive.

    Components Tab

    Add raw materials and sub-assemblies:

    • Product - The raw material or sub-component.
    • Quantity - Amount per BOM quantity.
    • Unit of Measure - Can differ from product UoM (e.g. kg vs g).
    • Scrap (%) - Expected waste %. Quickenerp reserves extra material.
    • Operations - Which operation consumes this component.
    • Apply on Variants - For multi-variant products.

    By-Products Tab

    If the production process yields secondary products (e.g. sawdust, scrap metal), add them here. The by-product quantity is deducted from total production cost.

    Multi-Level BOMs (Sub-Assemblies)

    If a component has its own BOM, Quickenerp recursively explodes it. Create a BOM for the sub-assembly, then add the sub-assembly as a component. When the MO is created, the system shows all raw materials at the lowest level.

    Kit (Phantom) BOM

    For products sold as a set but not physically assembled. The components are delivered individually. Use BOM Type = "Kit". No MO is created - the kit is delivered directly from stock of its components.

    BOM Versioning

    Create multiple BOMs for the same product. Set one as active. Use BOM version comparison to review changes. When you archive an old BOM, new MOs use the active BOM.

    New Content
    Introduction to Manufacturing
    Introduction to Manufacturing
    Preview

    The Manufacturing Module

    The Manufacturing module manages production processes. It integrates with Inventory (raw material consumption, finished goods receipt), Quality (workstation checks), Maintenance (equipment downtime), and Accounting (work in progress, cost analysis).

    Core Concepts

    Concept Model Description
    Bill of Materials (BOM)mrp.bomRecipe/parts list defining raw materials, quantities, and operations needed to produce a product.
    Manufacturing Order (MO)mrp.productionAn order to produce a quantity of a product. Consumes raw materials, produces finished goods.
    Work Centermrp.workcenterA machine, workstation, or production line where operations are performed.
    Routingmrp.routingSequence of operations (work centers) required to manufacture the product.
    Subcontractingpurchase.order with subcontract routeOutsource production to a third-party vendor.
    Planningmrp.schedule.productAuto-generate MOs based on reordering rules, manual triggers, or MRP.

    Menu Structure

    • Operations - Manufacturing Orders, By-Products, Subcontracting.
    • Master Data - Bills of Materials, Work Centers, Routings.
    • Planning - Replenishment, Planned Orders, Forecast.
    • Configuration - Settings, Operations, Product Categories.
    • Reporting - Manufacturing Analysis, Work Center Performance.
    This documentation is updated continuously. Some features described here may be renamed, deprecated, or still being finalized.